fbpx

Baron Residence Construction Progress (2nd Phase Development)

JULY 2024

Baron Residence Progress Update: Topped Out

We are pleased to announce that the project has reached a significant milestone: the structural framework has been topped out.

This achievement marks a crucial phase in the construction process, and we extend our gratitude to all team members and partners for their dedication and hard work.

Baron Residence
Baron Residence
Baron Residence

(Photos taken on 8th July 2024)

JUNE 2024

Block A – Completed 2A, 2B on floor 34th, 2D on floor 26th

Block B – Completed 2A, 2B on floor 36th, 2D on floor 26th

Block C – Completed 2A, 2B on floor 36th, 2D on floor 26th

Baron Residence
Baron Residence
Baron Residence

(Photos were taken on 05/06/2024.)

MAY 2024

Block A – Completed 2A, 2B on floor 28th, 2C on floor 17th, 2D on floor 20th.
Block B – Completed 2A, 2B on floor 30th, 2C on floor 18th, 2D on floor 20th.
Block C – Completed 2A, 2B on floor 30th, 2C on floor 18th, 2D on floor 20th.

Baron Residence
Baron Residence
Baron Residence

(Photos were taken on 06/05/2024.)

APRIL 2024

Lake City’s 2nd Phase Development- Baron Residence progress update. 🏗

Block A – Completed 2A, 2B on floor 23th, 2C on floor 13th, 2D on floor 13th

Block B – Completed 2A, 2B on floor 25th, 2C on floor 14th, 2D on floor 13th

Block C – Completed 2A, 2B on floor 25th, 2C on floor 14th, 2D on floor 13th

Baron Residence
Baron Residence
Baron Residence

(Photos were taken on 5th April 2024.)

MARCH 2024

Lake City’s 2nd Phase Development- Baron Residence progress update. 🏗

Block A – Completed 2A, 2B on floor 18th, 2C on floor 13th, 2D on floor 10th

Block B – Completed 2A, 2B on floor 19th, 2C on floor 14th, 2D on floor 10th

Block C – Completed 2A, 2B on floor 20th, 2C on floor 14th, 2D on floor 10th

Baron Residence
Baron Residence

(Photos were taken on 2nd March 2024.)

JAN 2024

Lake City’s 2nd Phase Development- Baron Residence progress update. 🏗

Block A – Completed 2A, 2B on floor 8th, 2C on floor 3th, 2D on floor 3th.

Block B – Completed 2A, 2B on floor 9th, 2C on floor 3th, 2D on floor 3th.

Block C – Completed 2A, 2B on floor 10th, 2C on floor 4th, 2D on floor 4th.

Baron Residence

(Photos were taken on 16th Jan 2024.)

2023.Nov

Baron Residence (2nd Phase Work Progress)
Block A – Completed 2A & 2B on floor 5th
Block B – Completed 2A & 2B on floor 6th
Block C – Completed 2A & 2B on floor 6th

https://www.facebook.com/profile.php?id=100089612787384
Baron Residence @Lake City(2nd Phase Construction Progress)
Kepong hot selling property with waterfront smart community
Lake City Township 1st Phase & 2nd phase Development @ Kepong


2023.Oct

Baron Residence (2nd Phase Work Progress)
Block A – Completed 2A & 2B on floor 1st
Block B – Completed 2A & 2B on floor 2nd
Block C – Completed 2A & 2B on floor 3rd

甲洞 湖景 公寓 城市 发展
Waterfront mix development at kepong

2023. AUG

Baron Residence (2nd Phase Work Progress)
Block A – Completed 2A ;
Block B – Completed 2A ;
Block C – Completed 2A & 2B on floor 1st

Aradia Residence Construction Progress (1st Phase Development)


2023.Nov

Lake City 1st Phase Development – Aradia Residence

2023.Oct

Aradia Residence (Lake City 1st Phase Development )
Block A – Completed 2B & 2E & 2F & 2G; 
Block B – Completed 2B & 2E & 2F & 2G;  
Block C – Completed 2B & 2E & 2F & 2G; 

Thank you to our Lake City Aredia Residence purchasers for your trust and support through thick and thin. Your new homes are expected to be completed and receive their CCC (Certificate of Completion & Compliance) by the end of this year
甲洞 湖景 城镇 首期 公寓
Kepong Waterfront Real Estate Property
甲洞 湖景 城镇 首期 公寓
Kepong Waterfront Real Estate Property

2023.Aug

Aradia Residence (Lake City 一期发展)
Block A – Completed 2B & 2E;
Block B – Completed 2B & 2E;
Block C – Completed 2B & 2E.

” Your new home is coming soon.✨🏡


2023.Jun

Aradia Residence (Lake City’s 1st Phase Development)
Block A – Completed 2B & 2E on floor 42nd; 
Block B – Completed 2B & 2E on floor 42nd; 
Block C – Completed 2B & 2E.

甲洞综合体发展Lake City
Lake City 第一期湖景公寓 – Aradia Residence

Home is where memories are made.

– Anonymous

2023.May

Aradia Residence – Lake City’s first phase development
Block A – Completed 2B & 2E on floor 39th; 
Block B – Completed 2B & 2E on floor 38th; 
Block C – Completed 2B & 2E.

综合体房地产
Lake City 综合体房地产发展第一期 – Aradia Residence
Lake City Township Development Phase 1 - Aradia Residence
Aradia Residence Construction Progress @ Lake City (1st Phase Development)

2023.Apr

Aradia Residence – Lake City’s first phase development
Block A – Completed 2B & 2E on floor 36th; 
Block B – Completed 2B & 2E on floor 37th; 
Block C – Completed 2B & 2E.


2023.Mar

Aradia Residence – Lake City’s first phase development
Block A – Completed 2B & 2E on floor 30th; 
Block B – Completed 2B & 2E on floor 29th; 
Block C – Completed 2B & 2E on floor 40th.

https://www.facebook.com/lakecitykl
Kepong New Condo and Mix Development
Lake City Township Development Phase 1 – Aradia Residence

“Maybe that’s the best part of going away for a vacation — coming home again.”

— Madeleine L’Engle

2023.Feb

Aradia Residence – Lake City’s first phase development
Block A – Completed 2B & 2E on floor 28th; 
Block B – Completed 2B & 2E on floor 25th; 
Block C – Completed 2B & 2E on floor 38th.

lake city property gallery
Lake City Township Development Phase 1 – Aradia Residence
房地产 KL Kepong Township Property Development
Lake City Township Development Phase 1 – Aradia Residence
Kepong Township Property Development
Lake City 综合体房地产发展第一期 – Aradia Residence

“Home is the nicest word there is.”

— Laura Ingalls Wilder

2023.Jan

Aradia Residence – Lake City’s first phase development
Block A – Stage 2B on floor 42th & 2E on floor 17th; 
Block B – Completed 2B & 2E on floor 21st; 
Block C – Completed 2B & 2E on floor 31st.

real estate,房地产,甲洞,property,condo,Aradia Residence
Lake City Property Development at Kepong

“Home is where the heart is.”

— Proverb

2022.Dec

Aradia Residence – Lake City’s first phase development
Block A – Stage 2B on floor 38th & 2E on floor 14th; 
Block B – Stage 2B on floor 42th & 2E on floor 19th; 
Block C – Completed 2B and 2E on floor 29th.

real estate,房地产,甲洞,property,condo,Aradia Residence
real estate,房地产,甲洞,property,condo,Aradia Residence
Aradia Residence Construction Progress Dec.2022

2022.Nov

Aradia Residence – Lake City’s first phase development
Block A – Stage 2B on floor 36th & 2E on floor 12th; 
Block B – Stage 2B on floor 42th & 2E on floor 18th; 
Block C – Completed 2B and 2E on floor 28th.

2022.Oct

Aradia Residence – Lake City’s first phase development
Block A
-Stage 2B on floor 31th & 2E on floor 9th;
Block B-Stage 2B on floor 39th & 2E on floor 12th; 
Block C-Completed 2B and 2E on floor 27th.


Lake City
Celebrates Topping Up Ceremony For
Phase 1 Tower C Of Aradia Residence
@KL NORTH

2022.08.31
Lake City 湖边大型综合体开发项目, 其第一期的 Aradia  C栋公寓于Celebrates Topping Up Ceremony For Phase 1 Towel C Of Aradia Residence @KL NORTH

2022.Sep

Aradia Residence – Lake City’s first phase development
Block A
-Stage 2B on floor 27th & 2E on floor 6th; 
Block B-Stage 2B on floor 35th & 2E on floor 10th; 
Block C-Completed 2B and 2E on floor 27th.


2022.Aug

Aradia ResidenceLake City’s first phase development
Block A – Stage 2B on floor 25th & 2E on floor 5th;
Block B – Stage 2B on floor 32nd & 2E on floor 8th;
Block C – Completed 2B and 2E on floor 25th.


2022.Jun

Lake City’s first phase of development – Aradia Residence has completed the construction stage of 2(A) and Block A partially 2(D), Block B 2E partially 2(E), Block C partially 2(E)


2021.Oct

Lake City’s first phase of development – Aradia Residence has completed the construction stage of 2(a) and partially 2(b).


2020.Oct

Pilling progress for Lake City’s first phase, Aradia Residence is completed and now is undergoing the structural framework that begins in Oct.2020.


Property Under Construction in Malaysia, its Progressive Payment Schedule are broken down into 5 main stages. namely signing of Sale and Purchase Agreement (SPA), various completion stages of the development, vacant possession, submission for subdivision of building, and final payments.

1. Signing of Sale and Purchase Agreement (SPA)
2. Within twenty one (21) working days after receipt by the Purchaser of the Vendor’s written notice of the completion of :
(a) the work below ground level including piling and foundation of the said Building comprising the said Parcel.
(b) the reinforced concrete framework and floor slab of the said Parcel.
(c) the walls of the said Parcel with door and window frames placed in position.
(d) the roofing/ceiling, electrical wiring, plumbing (without fittings), gas piping (if any)and internal telephone trunk and cabling to the said Parcel.
(e) the internal and external plastering of the said Parcel.
(f) the sewerage works serving the said Building.
(g) the drains serving the said Building.
(h) the roads serving the said Building.
3. On the date the Purchaser takes possession of the said Parcel with water and electricity supply ready for connection to the said Parcel.
4. Within twenty-one (21)working days after receipt by the Purchaser of the written confirmation of the Vendor‘s submission to and acceptance by the Appropriate Authority of the application for subdivision of the said Building.
5. On the date the Purchaser takes vacant possession of the said Parcel as in item 3 and to be held by the Vendor‘s solicitor as a stakeholder for payment to the Vendor as follows :
(a) two point five per centum (2.5%)at the expiry of six (6)months after the date the Purchaser takes vacant possession of the said Parcel.
(b) two point five percent (2.5%) at the expiry of eighteen (18) months after the date the Purchaser takes vacant possession of the said Parcel.

Source: https://www.propertyguru.com.my/property-guides/progressive-payment-schedule-under-construction-property-malaysia-6943

– or contact your in-house consultant/real estate agent for the latest info –

Baron Residence Unveils New 3 Bedrooms Home

Lake City KL North is popularly known as the keyless access home located on the edge of Kuala Lumpur’s lake in Kepong. Following Overwhelming Response For Its previous unit types, Baron Residence is designed to encourage a healthy lifestyle and family-inspired activities. The 3 bedrooms Type C unit space around 872.96 sq.ft. is now open for registration at below.


lake city property development,kepong new condo open registration,甲洞房地产,吉隆坡公寓开放登记
Lake City’s Phase 2 – Baron Residence new 3 bedrooms unit open for registration

JOM! RM168 GET A HOME

Get your dream home with RM168! limited time offer ! Lake front living, FACE ID door Access, MRT2 and many more will surprise your!
Get your dream home with RM168! Limited time and Units!
Waterfront Living, FACE ID Door Access, MRT2, and many more will surprise you!

New Phase – BARON Show Units Opening!

LAKE CITY KL NORTH great to announce that
New Phase – BARON is Open for pre-registration &
Show units open for preview at
6th Mar 2021. (Saturday) 9am – 6pm

Make your reservation at the below link NOW

for desktop user, you may scan the below code to make reservation.

Meiyan宝贝女儿未来会住在哪?

身为妈妈的Meiyan 薇恩,为何会这么烦恼宝贝女儿?看后转发给朋友一起开心欢颜一笑~这个新年,祝大家新年快乐,Lake City 也如常开放预约接待,全天候不打烊。

身为妈妈的我,开始担心女儿的幸福了🤪

身为妈妈的我,开始担心女儿的幸福了🤪 . . 全新湖景智能公寓, 让你向往未来生活, 就在 LAKE CITY KL North 500至1600方尺让你选 现在就预约参观体验馆和Show Unit 👉 http://bit.ly/LCDCVid LAKE CITY祝您新年快乐,牛转乾坤 1300-22-9999 #lakecity #KLNorth #smartcommunity #lakefrontliving

Posted by Lake City KL North on Monday, February 15, 2021

https://fb.watch/3Lj2HDPESt/

Lake City 【老师傅】古早味美食 点餐配送服务

Lake City’s Club by The Lake《老师傅》 古早味美食,配合防疫目前暂停堂食用餐。为了让您随时都能享用美食佳肴, 新增外带和配送服务

8am-2pm 精美点心,特色猪肉面, 家常小菜
5pm-8pm 私厨大炒美食当前,举家共享


** 不跨州配送, 仅限10公里范围, 如有不便敬请原谅。

Lake City KL North Kepong Club by the lake food delivery

Lake City Second Phase Open for Registration

After the overwhelming responses of the phase one Aradia, now Lake City is OPEN for Registration for phase two, Baron!

MRT2 / Smart Community / Lakefront Living

Touch-free Era – Lake City 3.0 community upgrade

TAKE TOTAL CONTROL OF ACCESS CONTROL, MAKE YOUR HANDSFREE

Now, with the development of face recognition technology, access control has entered a new era. This contactless verification is more sanitary and more convenient, as users no longer need to worry about such things as carrying an ID card or opening a door when their hands are occupied.

Various access control methods have been in use for several years now. It all began with a written list of names on a sheet of paper. Later, magnetic and barcoded cards, and nowadays biometric technology such as fingerprints are commonly in use. Access control with face recognition technology is the latest trend applied in every phone and many other devices, this advanced technology can be extended to home access to ease everyone’s life.

智能生活 美好未来 享受无触摸的体验❗
⚡️人脸识别 ⚡️智慧物联 ⚡️智慧呼梯

☎️点击预约参观 

📣 ANNIVERSARY HOUSING SALES CARNIVAL💖

【LAKE CITY】
ANNIVERSARY HOUSING SALES CARNIVAL 📣
Glittering Rewards for Referrer !!
💎

Bring your friends here for Experience Hall tour 

✅ Limited Units ✅ Ultra-low Booking Fee ✅ RM 0 down payment
✅ Free Lawyer Fee ✅ Free Loan Stamp Duty

🎊Good things are meant to be shared ! 

【LAKE CITY】
一周年全民购房节 📣 心动不如行动💖!

推介成功就能获豪礼 🎁 赶快趁此机会带上你的朋友参观体验馆

✅ 限量房源 ✅ 超低定金 ✅ 免首付 ✅ 免律师费 ✅ 免按揭印花税

🎊 赶快趁此机会获得您梦想的房子和豪华礼品吧!

Construction Progress of Aradia Residence

The construction of the first phase of Lake City – Aradia Residence, is well underway.

Construction Progress of Aradia Residence
Lake City – Aradia Residence piling process @ 26.06.2020

Thank you for always being such an awesome owner for Lake City. With all the waiting, It is our pleasure to update your new home Aradia Residence construction progress.

The construction work for Aradia Residence begins in February.2020, we not only construct your new home but also keeping the lake ecological healthy. The construction is well underway and will keep you update from time to time.

Lake City Pinwheel Architecture Design

It allows wind flow around buildings that can dilute pollutants and remove excess heat, both of which are closely related to people’s health and quality of life. Residents can be living on the frontline against climate change and low carbon in Lake City.

Lake City Pinwheel architecture design
Lake City Pinwheel architecture design, constructed with the environment in mind, creating an energy-efficient, environmentally friendly house.

即将快失传的【童年游戏】,你还记得多少?

因为科技的发达,电子产品已经越来越普遍,现在的孩子手上不是一部平板电脑就是手机。现在的孩子已经和大人们一样,使用电子产品时间已占用生活中大部分的时间,不再像以前一样, 喜欢和朋友或是家人在客厅玩一些小游戏。

Nowadays, since technology becomes more advance, electronic products have become more and more common, and now children have either a tablet or a mobile phone. Today’s children, like most people, spend most of their time in using electronic devices and no longer enjoy interacting with friends and family or even play some games as much as children used to.

无论哪个年代,游戏都是儿童的天性。无论什么年龄阶段,想起自己小时候玩过的那些游戏,任何人都会露出会心的微笑。小时候,没有电视,更没有电子游戏,所有的游戏都是因地制宜的。全家人在客厅一整天都能玩得不亦乐乎, 玩起来,都会玩到一整天呢。

No matter what age, games are children’s nature. No matter what age, anyone will smile at the memory of those games he played as a child. During your childhood, there is no TV and video games, and all the game is adapted to local condition but children can play all-day.

因为疫情的来袭,大人和小孩们都必须待在家里,遵守政府所实行的行动管制令。行动管制令之下,除了使用电子产品来消磨时间以外,我们也能与孩子和进行亲子活动,教教他们那些怀念的童年游戏吧。一起来怀念童年的游戏,看看你还记得几个吧!

Because of the outbreak of COVID-19, both adults and children must stay at home and abide by the MCO imposed by the government. Under the action control order, in addition to using electronic products to kill time, we can also conduct parent-child activities with children and teach them the childhood games they miss. Let’s see our childhood game and see how many you still remember!

1. 五粒子 (Batu Seremban)

小时候玩的是路边的小石子,但老奶奶有时还会教我们 缝 缝小布袋 ,一共有五粒。孩子们很认真的学习如何丢,如何抓,如何接。全家人一起坐在客厅玩玩, 吹着宽大阳台吹进来的风, 幸福满满的哦~

As a child, I played with seven pebbles, but some old people sewed them in small bags for safety reasons. Children learn how to throw, how to catch, how to pick up. 

2. 拇指摔角 (Thumb Wrestling)

用大姆哥来玩摔角!看起来很简单的游戏玩起来很刺激!还记得以前在学校休息时间都会跟一班人一起玩,玩到好开心!

Using the thumb to wrestling look easy to play, but when you really play it, it is so exciting!

3. 手工折纸(Origami)

还记得以前撕掉的纸拿来折飞机让后丢来丢去和朋友比谁的飞最远或者是折船让后放在水上面给他飘来飘去,好怀念啊! 你还记得几样呢? 教教小孩折常用到的垃圾桶吧, 平日吃饭时还能折几个用来装骨头用呢。

Still, remember how we used to tear some paper and fold it into plane shape then see who can throw the furthest away? And also the boat shape one and we put it on the water to see it floating.

4. 打手指 (Finger Fight)

看到这个就很怀念了!用全手指的力气来打敌人的手指,你还记得游戏是 需要 换手指升级的吗? >.<

So nostalgic! Use all the finger strength to defeat the opponent finger, luckily the finger is still ok.

5. 一字马 (Scissor, Paper, Stone!)

剪刀石头布!猜拳输的就要拉长脚~这个时候就要看谁的一字马技术好,能撑到最后了!这个在家和小孩玩,客厅需要至少9尺宽,够大才可以哦~

Scissor, paper, stone! Who lose need to stretch their feet~ Whose split leap skill good can hang until the last!

长大了才发现,
客厅,不该是爸爸看着电视,
我经过去阳台晒衣服的场景而已。

6. 跳房子 (Hopscotch)

用粉笔在地上画出“房子”,用“串”来跳。“房子”的图样有好几种,玩法也各不相同。疫情在家, 客厅80cm*80cm的大地砖,也能用胶带贴出格子,就可以玩了。

Using chalk to draw the ‘home’ and hop on it. There are kinds of playing methods. Most of the time we use the stone and throw on the other box.

7. 橡皮大战 (Eraser Fight)

以前的橡皮从来不是用来擦的,而是用来玩的!哈哈!比谁的橡皮先反身压住对方的橡皮,就赢啦!我还记得爸爸和我也有一起趴在客厅地上玩这个呢. 每次都是爸爸赢的 ┐(-。ー;)┌

The eraser we have was never used for rubbing, but for playing! Haha! The one that holds down the other’s rubber first win!

8. Congkak

玩这个游戏要很厉害算哦!算的不对还可能会被反击了!我小时候也没有买congkak的木船, 可是~动动一下小聪明~ 在家也可以拿几个小碗和绿豆就可以玩了!

Need to have calculate better otherwise will be counter-attack!

现在疫情在家, 是我们和长辈,小孩一起聚会的时候了。
可以教教年轻一辈的小孩这些我们都玩过的东西。
也可以分享jio你的朋友一起回味, 疫情过后大家来个大比拼!

点击这里观看视屏介绍 Click to watch video

宽广的客厅,无限的阳光。 
在家也能拥抱美好时光。

现在就关注了解更多吧 Follow us on Lake City Facebook
也可点击 +60122734990 直接whatsapp

【风帆互度.江海无波】6千口罩派缤湖城居民

news sinchew
星洲日报 https://www.sinchew.com.my/content/content_2241926.html

风帆互度,江海无波 Bagai Aur Dengan Tebing

希望社会因为我们的存在而变得更加美好 !

(吉隆坡26日讯)碧桂园马新区域今天向位于缤湖城周边的居民和警察人员派发了约6000个口罩。

在碧桂园中国广东省总部的支持下,碧桂园马新区域成功从中国运输了口罩,并在当地派发给有需要者。

该活动在碧桂园马新区域吉隆坡片区副总经理俞雄伟的带领与峇都区国会议员峇拉巴卡兰的协助下顺利进行。

为确保居民和工作人员的安全与健康,缤湖城采取了严格的预防措施,包括对住宅区域内的所有公共设施进行消毒。物业管理部门也敦促所有居民和工作人员遵守马来西亚政府实施的行动管制令。

碧桂园国强公益基金会及森林城市正在筹备更大规模的抗疫物资捐赠。

文章来源 : 星洲日报 2020-03-27

Visit Lake City KL and Take a Free Property Tour!
Please enable JavaScript in your browser to complete this form.
Subscribe today!